Case Study: Large-Scale EV Charging Infrastructure for Government Department
Project Overview
A government department required a large-scale electric vehicle (EV) charging infrastructure to support the transition to a fully electric fleet. The goal was to ensure seamless operations, optimise energy efficiency, and future-proof the site for continued fleet expansion.
Quick Facts
Client: Government agency
Location: Auckland, New Zealand
Scope: EV Charger Network for vehicle fleet
Budget Outcome: Delivered under budget through strategic procurement
Implementation Timeframe: 18-24 months from design to commissioning
Key Benefit: Enabled full fleet electrification with optimised charging schedules
Solution
Infrastructure Planning: Conducted a site assessment to optimise charger placement and power distribution.
Scalability & Load Management: Implemented dynamic load balancing to prevent grid strain while enabling future expansion.
Renewable Energy Integration: Designed for future solar and battery integration to lower operational costs.
Cultural & Environmental Considerations: Collaborated with local iwi to respectfully relocate trees in line with Māori customs.
Fleet Optimization: Configured a management platform for real-time usage insights and cost tracking.
Results
Charger Deployment: 50 chargers deployed, supporting <80% of the total vehicle fleet on-site.
Efficiency Optimisation: Advanced load management software reduced energy costs and balanced demand.
Sustainability Contribution: Helped the department meet sustainability goals through carbon abatement.
Scalability: Future-proofed infrastructure for potential fleet expansion.
Operational Impact: Enabled quicker, more accessible charging for fleet vehicles.
This project was delivered on behalf of our client, Thundergrid.
Looking to transition your fleet away from fossil fuels?
Contact us to explore scalable EV charging solutions.